Wholesale Stove Accessories

Stove Jacks and Flashing Kits for Compatible Flue Passages

Plan the flue passage around the shelter panel or roof, chimney construction and installation method. Heat separation, reinforcement and water drainage need to work together in the finished detail.

Panel and roof matching Flue-clearance planning Attachment and drainage options
Stove-jack and flashing components for a pipe passage
MOQConfirm by model
Est. FOB$4-20 / pc
Passage compatibilityMatch the panel or roof and flue system
Primary useCompatible stove-ready shelters, approved roof or wall passages

Product Focus

Check Heat, Structure and Weather Protection Separately

A heat-resistant material does not by itself make a pipe passage safe or watertight. Match the opening and attachment to the actual fabric, membrane or roof build-up, then confirm pipe separation and water-shedding details. The appliance, flue and shelter or building instructions remain essential to the installation.

Identify the Surrounding Construction

Provide the fabric or membrane, coating, roof profile and pitch, backing and reinforcement so attachment loads can be supported.

Confirm the Actual Flue Dimensions

Check pipe family, wall construction, outside diameter, joint location, thermal duty and required separation. Nominal bore is not enough.

Plan the Attachment and Drainage

Show seams, fasteners, clamps or curbs, suitable sealants, uphill and downhill overlaps, drainage and inspection access in the installation detail.

Design Details

Reinforce, Separate, Attach and Drain

Review the full passage section, from inside reinforcement and pipe clearance to outside overlaps and drainage.

01

Prepare and Reinforce the Opening

Confirm dimensions, cut edges, backing and how wind or flashing loads transfer into the panel or roof.

02

Check Pipe Clearance

Review actual outside dimensions, wall construction, joints and movement against the passage and system requirements.

03

Confirm the Attachment

Specify seams, fastener patterns, clamps or curbs, compatible sealants and surface preparation for the construction.

04

Plan Water Shedding

Review overlaps, drainage, edges, penetrations and inspection access without assuming the detail is weatherproof in every setting.

Specifications

Panel, Roof and Flue-Passage Details

Confirm the surrounding construction, chimney system and installation method together.

Passage and Construction Options

Product format
Stove-jack or roof-flashing components for a specific flue passage
Panel or roof
Tent panel, membrane, metal roof or prepared construction and revision
Flue system
Pipe family, wall type, outside diameter and operating duty
Typical applications
Compatible stove-ready shelters and approved roof passages

Opening, Pipe and Attachment Details

Opening
Size, cut shape, edges, reinforcement and backing
Pipe relationship
Position, separation, joint location, movement and restraints
Attachment
Seams, fasteners, clamps, curbs, sealants and surface preparation
Weather Exposure and Drainage
Roof pitch, overlaps, drainage, wind and inspection access

Compatibility and Shelter Requirements

Compatibility
Only the matching panel or roof and flue installation detail
Heat resistance
Material alone does not replace required system separation
Installation
Follow the approved installation method and use a qualified installer where required
Shelter operation
Ventilation, working CO alarm, constant supervision and no use while sleeping

Materials & Finish

Passage Materials and Attachment Options

Flexible parts, metal components, seals and fasteners have different heat, structural and weather duties. Confirm the exact construction for your order.

Coated-Fabric Passage

Confirm fabric, coating, thickness or weight, thermal test data, edge finish and seams for the selected shelter panel.

Metal Collar or Flashing

Review grade, thickness, profile, seams, flange and pipe relationship against the roof construction and exposure.

Fasteners, Backing and Sealants

Confirm materials, sizes, attachment pattern, substrate compatibility and application limits. Include inspection and replacement requirements.

Applications

Shelter and Roof Flue Passages

Select components for the actual panel or roof and chimney arrangement, with installation by a qualified person where required.

Stove-Jack Shelter Panels

Match the panel and flue arrangement. Maintain ventilation, a working CO alarm, required clearances and constant supervision. Do not operate the stove while sleeping.

Metal and Membrane Roofs

Confirm roof profile, pitch, backing, overlaps, fasteners, sealants and drainage alongside the chimney requirements.

Replacement Passage Components

Use the original panel or roof detail, opening, attachment and flue references instead of diameter or appearance alone.

OEM & Private Label

Customize a Stove Jack or Flashing Kit

Share the passage drawing to review reinforcement, pipe separation, attachment components and drainage.

  • Match flange, opening and backing to the roof pitch or panel construction.
  • Size the passage for the actual flue wall, outside diameter, joint and required separation.
  • Review coated-fabric, silicone-based and metal formats for their different attachment and exposure requirements.
  • Include only threads, fasteners, sealants and backing compatible with the construction.
  • Add cut lines and orientation marks alongside the appliance, flue and site instructions.
  • Provide branded installation sections, component lists, drainage and inspection guidance.

FAQ

Stove Jack and Flashing Kit FAQs

Questions about panel compatibility, pipe contact, weather protection and shelter use.

Will one stove jack fit every tent panel?

No. Fabric, coating, panel location, reinforcement, seams, flue construction and required separation vary between shelters.

Can the chimney touch the passage material?

Only where the exact appliance, flue and shelter installation permits contact. Appearance or a heat-resistant label does not establish that permission.

Does a heat-resistant passage make tent stove operation safe?

No. Compatible equipment, required separation, ventilation, a working CO alarm, constant supervision and no use while sleeping remain necessary.

Which details help the passage shed rainwater?

Show roof pitch, uphill and downhill overlaps, collars or hoods, fastener penetrations, suitable seals, drainage direction and inspection points. Do not assume universal weatherproofing.

Can one flashing kit be installed on any roof?

No. Profile, pitch, roof layers, backing, attachment, drainage and chimney requirements must suit the installation and local rules.

What should I send for a passage-kit quote?

Send the panel or roof build-up, opening, backing, flue family and outside dimensions, required separation, attachment and drainage details, quantity and destination.

Request Stove Jacks & Flashing Kits Quote

Need pricing for Stove Jacks & Flashing Kits?

Share the target dimensions, material, finish, accessories, packaging, order quantity and destination market so we can prepare your quotation.